2025 Polestar 4 Long Range Single Motor
electric motor (200 kW PMSM) · RWD
Official EPA record #48407 from FuelEconomy.gov · data 2026-07-26 · every assumption below is yours to edit. How this is computed
Per month
$68.87
Per year
$826
Per mile
6.9¢/mi
5-year total
$4,130
The EPA figure for this record is 37 kWh per 100 miles. If your car reports Wh per mile, divide by 10; if it reports miles per kWh, divide 100 by it. Your number replaces the EPA values and is never averaged with them.
Off by default: every mile is priced at the single electricity rate above. Turn this on to price home, off-peak and public charging separately.
Per fueleconomy.gov cold-weather guidance for 20°F short city trips — off by default.
Notes & official EPA estimate
- EPA electricity consumption is measured from the wall outlet, so typical home AC charging losses are already included. Public DC fast-charging prices, extreme temperatures, and driving style can change real-world cost.
Official FuelEconomy.gov estimate: $850/year — assumes 15,000 miles/year and EPA price assumptions. The figures above use your inputs instead.
Official EPA efficiency
| Measure | Value |
|---|---|
| City electricity use | 36.0 kWh/100 mi |
| Highway electricity use | 39.0 kWh/100 mi |
| Combined electricity use | 37.0 kWh/100 mi |
| EPA label MPGe (city/hwy/combined) | 93 / 87 / 90 |
MPGe is the EPA's energy-equivalent rating, not miles per gallon of fuel. It is shown for reference and never used in these cost calculations.
Official EPA estimates
| Estimate | Value |
|---|---|
| Official annual fuel cost (15,000 mi/yr) | $850/yr |
| Range | 300 mi |
| Tailpipe CO₂ | 0 g/mi |
| EPA greenhouse gas score | 10/10 |
| EPA smog rating (Federal Tier 3 Bin 0) | 10/10 |
| Charge time at 240V | 11 h |
Source: U.S. EPA / DOE FuelEconomy.gov, vehicle record #48407 (record updated 2024-09-10). Snapshot processed 2026-07-26; page data last changed 2024-09-10.
Related configurations
Same year, same family